Construction Scrapbook

Click on any of the images below to see a larger version.


Bar joists partially spread at roof


A view from the north showing sequence 1 & 2 set


Cables in place to plumb sequence 1 & 2


Welding of moment connection at roof


A complete moment connection weld at the top of a beam


Bolted connection almost complete, the LeJeune bolts to the left have the ends sheared off and the tensioning is complete


First floor elevator rail support beams installed


Precast embeds welded into place


Studs installed at 2nd floor deck


Mesh in place for deck pour


Roof screen column being welded


Roof deck being cleared after overnight snow


Due to sun on the roof deck melting the snow, ice has formed and will need to be removed before deck pour


Secondary conduits for power


Roof screen framing complete


2nd floor elevator columns installed


Steel going up


Steel going up


Steel going up