Bar joists partially spread at roof
A view from the north showing sequence 1 & 2 set
Cables in place to plumb sequence 1 & 2
Welding of moment connection at roof
A complete moment connection weld at the top of a beam
Bolted connection almost complete, the LeJeune bolts to the left have the ends sheared off and the tensioning is complete
First floor elevator rail support beams installed
Precast embeds welded into place
Studs installed at 2nd floor deck
Mesh in place for deck pour
Roof screen column being welded
Roof deck being cleared after overnight snow
Due to sun on the roof deck melting the snow, ice has formed and will need to be removed before deck pour
Secondary conduits for power
Roof screen framing complete
2nd floor elevator columns installed